Our VillageVisiting & TourismEconomic DevelopmentDepartmentsFAQs
HomeSitemapContact US
Village Court
Village Office
Department of Public Works
» Wastewater Treatment Plant
» Pretreatment Program
» Water Treatment Plant
» Highway/Trees/Parks
» Water/Sewer Maintenance
» Cemetery
Animal Control
Police Department
Fire Department
Ambulance
Mayor and Village Board


  GO!




Pretreatment Program


   
Phone Number:   (585)289-6094
Fax Number:   (585)289-6094
Email:  

newarkwater@a-znet.com 

   
Hours:   Monday - Friday
7:00 a.m. - 3:30 p.m.
   
Coordinator: Carlton Timerson
(315)952-8966(cell)

Primary TanksGeneral pretreatment regulations for point sources of pollution were promulgated in final form by the USEPA in 1978. This regulation was intended to reduce the health and environmental risk of pollution caused by non-domestic discharges into Publicly Owned Treatment Works. The USEPA strategy was to establish the responsibilities of Federal, State and local governments, industry, and the public in the development and enforcement of Pretreatment Standards for the control of pollutants that could:

  • pass through a treatment plant and create receiving stream water quality problems

  • interfere with treatment processes

  • limit opportunities to recycle or reclaim municipal and industrial wastewaters and sludges

As a result of these regulations, the Village of Newark contracted with Lu Engineers to develop an Industrial Pretreatment Program in 1984. Lu Engineers continues to oversee the program, assisting in industrial inspections, surveys, sample scheduling and annual reports. Tasks performed as part of the Pretreatment program include:

  • Conduct surveys to determine industries that may need to be permitted

  • Perform headworks analysis at wastewater treatment plant to determine or estimate pollutant removals and tolerances and develop a list of concentration limits.

  • Biannual inspections of participating industries
  • Design and conduct sampling programs

  • Monitor industries in order to ensure compliance

  • Enforce pretreatment program by investigating and requiring correction of instances of non-compliance by participating industries

  • Compile sample results and file annual reports

Chief Water Treatment Plant Operator Carlton Timerson is the Village’s Pretreatment Coordinator and is assisted by Chief Wastewater Treatment Plant Operator Douglas Alaimo and WWTP personnel.

The Village of Newark Wastewater Treatment Plant was designed to remove conventional pollutants normally associated with residential or domestic wastes. Through its Industrial Pretreatment Program, the Village is protecting the wastewater treatment plant by establishing a base level of treatment for all participating industrial contributors.















Contact Us
Search Site
Site Map
Calendar/Board Meetings
Board Members
Letter From The Mayor
Village Code Book
2008 Annual Water Report
FOIL Request Form

Offices closed for Labor Day Sept. 6
September Planning Board & Zoning Board meetings cancelled
Village of Newark Tax Collection
Attention: Senior Citizens